• Three Target Magnetron Sputtering Coater with The Transition Chamber
  • Three Target Magnetron Sputtering Coater with The Transition Chamber
  • Three Target Magnetron Sputtering Coater with The Transition Chamber
  • Three Target Magnetron Sputtering Coater with The Transition Chamber
  • Three Target Magnetron Sputtering Coater with The Transition Chamber
  • Three Target Magnetron Sputtering Coater with The Transition Chamber

Three Target Magnetron Sputtering Coater with The Transition Chamber

After-sales Service: 12 Months
Warranty: 12 Months
Type: Coating Production Line
Coating: Vacuum Coating
Substrate: Steel
Certification: CE
Gold Member Since 2023

Suppliers with verified business licenses

Henan, China
to see all verified strength labels (15)
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • FAQ
Overview

Basic Info.

Model NO.
Magnetron Sputtering coater
Condition
New
Cooling Mode
Water Cooling
Heating Temperature
Max 500ºC
Rotate Speed
1-20rpm Adjustable
Substrate Size
Diameter 185mm
Vacuum Chamber
Stainless Steel
Magnetron Sputtering Target Head
3 Magnetron Sputtering Heads
Sample Stage Size
Maximum 4" Substrate Can Be Placed
Rotated Speed
1-20 Rpm (Adjustable)
The Highest Heating Temperature
500ºC
Temperature Control Accuracy
+/- 1.0 °c
Gas Flow Controller
2 Mass Flow Meters Installed Inside The Instrument
Vacuum Pump
a Set of Molecular Pump System, Using One-Button O
Cooling System
16L/Min.
Transport Package
Fumigated Wooden Box
Trademark
TN
Origin
China
HS Code
8486209000
Production Capacity
200/Month

Product Description

Three target magnetron sputtering coater with the transition chamber

 
Product Description

This equipment is three target magnetron sputtering coater apparatus, which can be used for the preparation of metal thin films. It has applications in the fields of electronics, optics, and special ceramic preparation. It can also be used for laboratory SEM sample preparation.
The three target magnetron sputtering coater is equipped with three magnetron targets and two sets of DC power supplies, which can be used to coat multilayer conductive metal films. At the same time, the equipment has two parts: a main chamber and a transition chamber. The transition chamber is equipped with a magnetic push rod, and a vacuum gate valve is installed between the two chambers; The user can load samples in the transition chamber while performing sputtering work in the main chamber, and perform vacuum pre-pumping. After the sputtering in the main chamber is completed, the sample can be pushed into the sample stage of the main chamber through the magnetic push rod. Such a design can reduce the number of vacuum pumping times in the main chamber, which not only effectively saves time, but also ensures a better local vacuum and effectively improves the quality of the coating.

 
Product Parameters
Working Voltage
  1. VAC 220, 60Hz
Sputtering Vacuum Chamber
  1. Dimension: ~ φ325xH510mm
  2. Material: 304 stainless steel
  3. Inner wall processing: electrolytic polishing
  4. Sealing method: Fluorine rubber seal
  5. Viewport (window): ~4'' (100mm) with shutter
Sample Holder
  1. Center bottom setting sample holder, with one shutter
  2. Sample holder: Dia. 150mm
  3. Rotary speed: 0~20rpm adjustable
  4. Heating temperature: RT~ 500oC
Magnetron Sputtering Gun
  1. Quantity: 3 sets
  2. Adjustable angle -45°~45°
  3. Sputtering orientation downwards
  4. Target dimension: diameter 2'', thickness max.3mm
Quartz Crystal Monitor
  1. Channel numbers: One-channel
  2. Accuracy: 0.1Ã
  3. Measurement speed: 100mS-1S adjustable
  4. Measurement range: 500 000Ã (Aluminum as a reference)
  5. Standard sensor quartz crystal: 6MHz
Vacuum System Backing Pump
  1. Double-stage rotary vane pump
  2. Pumping rate: 1.1L/s
Molecular Pump
  1. Pumping rate: 600 L/s
  2. Rated rotating speed: 27000rpm
  3. Starting time: <5min
  4. Cooling method: water cooling
  1. Vacuum degree: 5*10-4Pa
Composite Vacuum Gauge
  1. Resistance gauge + ionization gauge
  2. Measuring range: 10-5Pa ~ 105 Pa
DC Power Supply
  1. Quantity: 2 sets
  2. Output power: 0~500W
  3. Output voltage: 0~600V
  4. Maximum output current: 1A
  5. Starting time: 1~10s
RF power supply
  1. Quantity: 1 set
  2. Output power: 0~500W
  3. RF frequency: 13.56 MHz
  4. Matching method: automatch
  5. Reflected power: <=100W
  6. Power stability: ±0.1%
Mass Flow Controller
  1. One-channel MFC for Ar gas
  2. Measuring range: 0~200sccm
Water Cooler
  1. Flow rate: 10L/min
  2. Power: 0.1KW
  3. Cooling power: 50W/ºC
  4. Tank capacity: 9L
Control
  1. PLC automatic control
Transition chamber
  1. The chamber size will be for max. 4inch wafers.
  2. Equipped with one compact molecular pump group
  3. Backing pump: VRD-4, pumping speed: 1.1L/s
  4. Model of molecular pump: TG60F
  5. Pumping speed of molecular pump: 60L/s
 
Detailed Photos

Three Target Magnetron Sputtering Coater with The Transition ChamberThree Target Magnetron Sputtering Coater with The Transition ChamberThree Target Magnetron Sputtering Coater with The Transition Chamber

 

FAQ

 


Three Target Magnetron Sputtering Coater with The Transition Chamber
Q. Are you a manufacturer or a trading company?

A. We are professional laboratory instrument manufacturers, have our own design team and factory, have mature technical experience, and can guarantee the quality of products and the optimal price.

Q. How is your company's product after-sales service system?

A. The product warranty period is 12 months, we can provide lifetime maintenance. We have professional pre-sales and after-sales departments that can respond to you within 24 hours to resolve any technical issues.

Q. How long is your delivery time? If I want to customize the instrument, how long does it take?

A.1. If the goods are in stock, it is 5-10 days. 2. We can provide customized services for our customers. It usually takes 30-60 days depending on the specifications of the custom instrument.

Q. Our country's power supply and plug are different. How do you solve it?

A. We can supply a transformer and plug according to your local requirements according to the power plug of different countries.

Q. How to pay?

A.T / T, L / C, D / P, etc., it is recommended to use Alibaba Trade Guarantee.

Q. How is the package of goods? Delivery methods?

A.1. Standard export fumigation sign wooden box packaging 2. Express, air, sea shipping according to customer requirements, find the most suitable way.

More questions, please contact us.

Three Target Magnetron Sputtering Coater with The Transition ChamberThree Target Magnetron Sputtering Coater with The Transition ChamberThree Target Magnetron Sputtering Coater with The Transition ChamberThree Target Magnetron Sputtering Coater with The Transition ChamberThree Target Magnetron Sputtering Coater with The Transition ChamberThree Target Magnetron Sputtering Coater with The Transition ChamberThree Target Magnetron Sputtering Coater with The Transition Chamber
Thanks for your efforts to make the world bettter!
Any questions about our spin coater, please contact us.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory
Main Products
Evaporation Coater; Film Coater
Number of Employees
13