After-sales Service: | on-Line Service |
---|---|
Warranty: | One Year |
Accuracy: | ±0.6-1% |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The gas control system is designed for the control of 1-4 types of gases flowing through vacuum-sealed tube furnaces at a low cost.
The gas control system is installed in a heavy duty mobile cart where the tube furnace can be placed on the top. The front panel in the system has adjust
valves and displays for the flow rate of gases. By combining with tube furnaces, it can be used as CVD system and annealing furnace to study the gas
environmental influence has on materials
Function | Two Channels | Three Channels | Four Channels |
Mass Flow Controller |
Voltage: 185~245V 50/60Hz Max. Output Power: 18W Working Temperature: 5~45C Max. Pressure: 3x106 Pa Accuracy: ±1% FS Controlling Range:1~500 SCCM |
Voltage: 185~245V 50/60Hz Max. Output Power: 18W Working Temperature: 5~45C Max. Pressure: 3x106 Pa Accuracy: ±1% FS Controlling Range: 0~500 SCCM |
Voltage: 185~245V 50/60Hz Max. Output Power: 18W Working Temperature: 5~45C Max. Pressure: 3x106 Pa Accuracy: ±1% FS Controlling Range:0~500sccm |
Removability | 4 heavy duty wheels included Max load: 500Lbs | ||
Mechanical Pressure Gauge |
Measurement Range: -0.1~0.15 MPa (0.01 MPa/grid) | ||
Needle Valve |
316 Stainless Steel | ||
Pipe fitting | Pipe fitting: 1/4" stainless steel, 12'' length 1/4" ID Nylon pipe for immediate use | ||
Gas mixing tank |
Φ80X120mm | ||
Stop valve | 316 stainless steel needle valve, Φ1/4" | ||
Dimension | 600x600x650 mm | ||
Compliance | CE certified | ||
Warranty | One year limited with lifetime support |
Q. Are you manufacturer or trading company?
A. We are professional manufacturer of laboratory instruments, We have professional R&D team and workshop, which can promise the qulaity and after-sale service.
Q. How's your warranty?
A. Our warranty is 12 months, and provide lifetime maintenance. We provide 24 hours on-line service.
Q. How long is your delivery time? If I want to customize the instrument, how long does it take?
A. 5-10 days----in store. Customzied products---It usually takes 30-60 days depending on your requirements.
Q. Power supply and plug?
A. We can provide products accroding to your local voltage and plug standard.
Q. How to pay?
A. T T, L / C, D / P, etc.
Q. How is the package of goods? Delivery methods?
A. Standard export fumigation sign wooden box packaging or as your requirements.